Earth View, LLC

Our job isn’t just to solve problems but to build relationships and strengthen communities.

Location Naples, FL View Website Website icon

Our job isn’t just to solve problems but to build relationships and strengthen communities.

Location Naples, FL
View Website Website icon

About

Earth View, LLC (EV) is a premier utility locating and trenchless construction company serving both the private and public sectors nationwide.

EV is a women-led, family-owned, and operated business founded in 2004. From humble beginnings locating utilities, EV has evolved into a leader in the trenchless technology industry.

Earth View understands the importance of locating utilities prior to construction in today’s industry. Construction crews are constantly challenged by uncertain subsurface utility plans, existing infrastructure, and environmental conditions. By leveraging our experienced team and the most advanced technology around, we provide cost-efficient and non-invasive solutions to your utility and underground problems.

EV provides a wide range of capabilities: from ground penetrating radar to horizontal directional drilling, wirelining, and CCTV pipe inspections.

About Earth View, LLC

Projects

Palatka Expansion Project
Learn more on the right
Savannah River Comcast Fiber
Learn more on the right
City of Naples Reclaimed Water Interconnect
Learn more on the right
Turkey Point Nuclear Plant HDD
Learn more on the right
Project Details:
This project involved several single Horizontal Directional Drills including 2,500 LF, 2,400 LF, 1,687 LF, 1,815 LF, and 1,600 LF of 30” steel pipe for TECO Gas Company.
Palatka Expansion Project
Project Details:
Earth View was requested by Comcast to install 4,800LF of 8” steel pipe in Savannah, GA. Located alongside a major highway system, EV was required to set up in the congested median of the highway interconnect.
Savannah River Comcast Fiber
Project Details:
This project involved the installation of 2,431 LF of 20” HDPE pipe by Horizontal Directional Drill (HDD).
City of Naples Reclaimed Water Interconnect
Project Details:
At the request of FP&L, Earth View fused and installed 2,060LF of 12” HDPE at Turkey Point Nuclear Plant via Horizontal Directional Drill (HDD).
Turkey Point Nuclear Plant HDD

Positions