Berg Construction, LLC

We build enduring infrastructure so our team, family and community will succeed.

Location Morgantown, PA View Website Website icon

We build enduring infrastructure so our team, family and community will succeed.

Location Morgantown, PA
View Website Website icon

About

From our beginnings as an owner operator through today, Berg provides a full spectrum of services including excavations, septic systems, land clearing and demolition. Our many years of combined experience together with our attention to detail has produced many happy, loyal customers. Our estimating department’s experience matched with that of the project management team contributes to the quality of the work we provide here at Berg.

We believe that by keeping up with technological advances, we are able to better assist our customers as well as ourselves. The wise use of technology within our company translates to higher productivity which helps us to stay resilient in today’s economy. By employing the latest technology, we are able to manage our projects more effectively.

About Berg Construction, LLC

Projects

28 Acre Cell Capping
Learn more on the right
75,000 Cubic Yards of Daily Cover
Learn more on the right
Hillside
Learn more on the right
Keystone Manufacturing
Learn more on the right
Phelps School
Learn more on the right
Project Details:
Berg was contracted to complete all the excavation work related to the final closure and capping of a 28 acre cell for SECCRA. We performed the work within a tight deadline completing both the capping of the cell as well as 50,000 cubic yards of overfill relocation.
28 Acre Cell Capping
Project Details:
Berg was contracted to provide daily cover for the Authority. This project required the transport of soil between two sites by way of a state highway.
75,000 Cubic Yards of Daily Cover
Project Details:
• 100,000 square foot building pad • 40,000 cubic yards of fill import • 2,650 linear feet of pipe work • Installation of utilities • 9,800 square yards of paving • 500 linear feet of curb • 2,500 square feet of sidewalk • Installed all E&S control measures • Installed storm water management basins
Hillside
Project Details:
Berg was contracted to complete all the site work related to a new manufacturing facility. We started by completing a bypass swale for the DEP and then installed storm pipe, basins, and stone sub base for paving and concrete. We also helped lower costs by lowering the building by 12” to reduce the cost of imported soil.
Keystone Manufacturing
Project Details:
• 23,000 square foot building pad • 3,310 linear feet of pipe work • 27,500 cubic yards of earth moved • Installation of utilities • 5,670 square yards of paving • 2,250 linear feet of curb • 11,000 square feet of concrete flatwork • Installed fire access road with GeoWeb • Installed all E&S control measures • Installed storm water management basins
Phelps School

Positions